Skip to main content
. 2018 Oct 31;4:51. doi: 10.21037/mhealth.2018.10.03

Table 2. Cost evaluation indexes for the total duration of the project, considering the total cost of the program and only the recurring cost.

Cost Total intervention cost ($) Recurring cost ($)
Cost per kit dispensed 41.57 34.42
Cost per preliminary HIV case identified 3,418.58 2,830.34
Cost per preliminary HIV case linked to AHF 29,057.91 24,057.91

AHF, AIDS Healthcare Foundation.