Table 2. Cost evaluation indexes for the total duration of the project, considering the total cost of the program and only the recurring cost.
Cost | Total intervention cost ($) | Recurring cost ($) |
---|---|---|
Cost per kit dispensed | 41.57 | 34.42 |
Cost per preliminary HIV case identified | 3,418.58 | 2,830.34 |
Cost per preliminary HIV case linked to AHF | 29,057.91 | 24,057.91 |
AHF, AIDS Healthcare Foundation.