TABLE 2.
Description of sampling sites and parameters affecting sampling environments in wastewater treatment plants visited during winter and summer
| Wastewater treatment plant site | Stage(s) of treatment | Temp (°C) | Time of sampling |
|---|---|---|---|
| WWT1 | Screening | 19/21 | 9 a.m.–12 p.m. |
| Degritting/degreasing | 12.5/22 | 9 a.m.–12 p.m. | |
| Biofiltration | 13/23 | 9 a.m.–12 p.m. | |
| WWT2 | Screening | 19/16 | 9 a.m.–12 p.m. |
| Degritting/degreasing | 14.5/18 | 9 a.m.–12 p.m. | |
| Biofiltration | 9.5/19 | 9 a.m.–12 p.m. | |
| WWT3 | Primary screening | 24/15.5 | 9 a.m.–12 p.m. |
| Secondary screening | 19/18 | 9 a.m.–12 p.m. | |
| WWT4 | Screening | 17/19.5 | 9 a.m.–12 p.m. |
| Degritting/degreasing | 19.5/19.5 | 9 a.m.–12 p.m. | |
| Primary settling | 16/18 | 9 a.m.–12 p.m./12 p.m.–2 p.m. |