Skip to main content
. 2018 Nov 20;9:2242. doi: 10.3389/fpsyg.2018.02242

Table 3.

Correlation coefficients between all the parameters.

  2   3   4   5   6   7   8   9
1. Delay –0.54** –0.60**   0.66**   0.64**   0.17   0.25*   0.48**   0.51**
2. Ownership   0.61** –0.33** –0.39** –0.12 –0.29** –0.28** –0.32**
3. Agency –0.45** –0.58** –0.14 –0.44** –0.39** –0.56**
4. AMP   0.64** –0.02   0.07   0.79**   0.58**
5. VE-AMP –0.23*   0.43**   0.75**   0.83**
6. MT   0.27** –0.53** –0.31**
7. VE-MT   0.11   0.50**
8. VEL   0.79**
9. VE-VEL

p < 0.05, ∗∗p < 0.01. AMP, amplitude; VE-AMP, variable error of the AMP; MT, movement time; VE-MT, variable error of the MT; VEL, velocity; VE-VEL, variable error of the VEL.