Skip to main content
. 2018 Nov 21;18(11):4067. doi: 10.3390/s18114067

Table 1.

The time schedule of the performed SLT.

Step No. Load (kN) Time of Load Application and Delay in Starting Geodetic Meas. and First Readings of Dial Gauges Duration of Geodetic Measurements S3/C10 Delay in the Second Reading of the Dial Gauges Remarks
1 0 13:22 + 1 min 3 min/7.5 min -
2 49 13:25 + 1 min 3 min/7.5 min +7 min
3 73 13:34 + 1 min 3 min/7.5 min +8 min
4 97 13:43 + 1 min 3 min/7.5 min +8 min
5 121 13:51 + 1 min 3 min/7.5 min +9 min
6 146 14:19 + 1 min 3 min/7.5 min +8 min
7 0 14:30 + 1 min 3 min/7.5 min +8 min unloading
8 36 14:41 + 1 min 3 min/7.5 min +25 min battery change
9 73 15:08 + 1 min 3 min/7.5 min +8 min
10 97 15:17 + 1 min 3 min/7.5 min +7 min
11 121 15:25 + 1 min 3 min/7.5 min +8 min
12 134 15:43 + 1 min 3 min/7.5 min +9 min
13 0 15:53 + 1 min 3 min/7.5 min +13 min unloading
14 36 16:07 + 1 min 3 min/7.5 min +9 min
15 73 16:17 + 1 min 3 min/7.5 min +7 min
16 97 16:25 + 1 min 3 min/7.5 min +7 min
17 121 16:33 + 1 min 3 min/7.5 min 7 min
18 134 16:51 + 1 min 3 min/7.5 min +8 min
19 0 17:00 + 1 min 3 min/7.5 min +10 min unloading