Skip to main content
. 2018 Nov 28;5(11):181127. doi: 10.1098/rsos.181127

Figure 6.

Figure 6.

Computation time in seconds (blue line) for generating a cluster of Nc cells as a function of Nc. The quadratic fit (black line) is consistent with an effort increasing roughly linearly with the number of cells.