Skip to main content
. 2018 Nov 26;2018:7925219. doi: 10.1155/2018/7925219

Table 2.

The results of subgroup analyses and metaregression analyses on the association between night shift work and the risk of cancers.

Subgroup No. of studies Weight (%) OR (95% CI) I 2 P for heterogeneity P for interaction
Shift schedulea 0.570
 Rotating shift 29 46.97 1.14 (1.04–1.24) 68.7% <0.001
 Fixed shift 9 11.19 1.09 (0.90–1.31) 51.1% 0.037
 Mixed shift 27 41.84 1.20 (0.82–1.77) 80.7% <0.001
Type of cancerb 0.298
 Digestive system cancer 11 15.72 1.15 (1.01–1.32) 40.2% 0.081
 Hematological system cancer 5 9.12 1.08 (0.99–1.17) 54.7% 0.066
 Prostate cancer 11 16.10 1.26 (1.05–1.52) 73.2% <0.001
 Breast cancer 37 39.62 1.22 (1.08–1.38) 81.2% <0.001
 Reproductive system cancer 6 7.99 1.06 (0.85–1.32) 49.5% 0.078
 Lung cancer 5 7.53 1.08 (0.87–1.35) 53.4% 0.073
 Skin cancer 3 3.92 0.93 (0.50–1.74) 74.9% 0.019
Region 0.298
 Australia 3 5.03 0.91 (0.77–1.06) 0.0% 0.728
 Europe 27 48.92 1.18 (1.10–1.28) 75.1% <0.001
 Asia 11 14.29 1.11 (0.88–1.39) 78.3% <0.001
 North America 17 31.75 1.16 (1.04–1.31) 76.1% <0.001
Occupation 0.795
 Unclassified occupation 35 61.45 1.17 (1.10–1.25) 69.7% <0.001
 Industry 9 12.09 1.00 (0.81–1.24) 72.8% <0.001
 Nurses 14 26.46 1.17 (1.02–1.35) 80.6% <0.001
Study design 0.845
 Case-control study 21 32.23 1.28 (1.15–1.42) 66.5% <0.001
 Nested case-control study 6 9.08 1.30 (0.89–1.90) 88.0% <0.001
 Cohort study 31 58.69 1.07 (1.00–1.15) 70.9% <0.001
Exposure assessment 0.075
 Questionnaire 28 53.99 1.08 (1.00–1.17) 77.1% <0.001
 Interview 24 34.52 1.32 (1.17–1.49) 66.3% <0.001
 Database 6 9.06 1.00 (0.85–1.18) 77.1% 0.004
Number of adjusted variables 0.926
 ≤4 15 22.84 1.13 (0.99–1.28) 82.7% <0.001
 >4 43 77.16 1.16 (1.08–1.24) 72.8% <0.001
Study score 0.585
 Low quality 17 25.20 1.16 (0.98–1.37) 86.9% <0.001
 High quality 41 74.80 1.14 (1.08–1.21) 61.6% <0.001

a,bFive studies report their studies including different kinds of cancer; nine articles report their studies including different types of shift schedules. P values for metaregression.