Skip to main content
. 2019 Jan 2;14(1):e0208943. doi: 10.1371/journal.pone.0208943

Table 4. Post−pre differences between CCMP intervention and control sub-centres for ABER and API.

Outcome CCMP sub-centres post–pre difference (95%CI) p value Control sub-centres post–pre difference (95%CI) p value DID (95%CI) p value CCMP vs. control
ABER 6.41 (4.69, 8.14); p<0.01 2.84 (0.35, 5.34); p<0.05 3.6 (0.58, 6.56); p<0.05
API 9.2 (5.18, 13.21); p<0.01 3.68 (0.45, 6.90); p<0.05 5.52 (0.34, 10.70); p<0.05