Skip to main content
. 2018 Dec 27;20(1):114–125. doi: 10.3348/kjr.2018.0243

Fig. 6. Scatter plots for LV volumetric and mass measurements in standard segmented cine and real-time cine show good correlation in EDV (A), ESV (B), SV (C), EF (D), and mass (E) assessment.

Fig. 6

Brown dashed line indicates 95% confidence interval.