Table 4.
CR | AVE | MSV | CWR | JS | COM | SSI | JP | HWPR | LME | |
---|---|---|---|---|---|---|---|---|---|---|
CWR | 0.789 | 0.563 | 0.058 | 0.751 | ||||||
JS | 0.914 | 0.680 | 0.045 | 0.078 | 0.825 | |||||
COM | 0.869 | 0.528 | 0.288 | 0.177 | −0.101 | 0.727 | ||||
SSI | 0.874 | 0.584 | 0.236 | −0.030 | 0.212 | 0.171 | 0.764 | |||
JP | 0.843 | 0.574 | 0.236 | 0.063 | 0.206 | 0.259 | 0.486 | 0.757 | ||
HWPR | 0.825 | 0.614 | 0.162 | 0.034 | −0.053 | 0.347 | 0.315 | 0.403 | 0.783 | |
LME | 0.852 | 0.661 | 0.288 | 0.240 | 0.044 | 0.537 | 0.284 | 0.469 | 0.330 | 0.813 |
Notes: composite reliability (CR); average variance extracted (AVE); maximum shared variance (MSV); average shared variance (ASV). The square root of AVE is shown in bold on the diagonal.