Skip to main content
. 2018 Nov 28;3:322–330. doi: 10.1016/j.idm.2018.11.004

Table 3.

Final parameter estimates of the zero-generating model.

Variable Parameter Estimate Std. Error Wald Chi- Square Pr > Chi- Square Odds Ratio Lower 95% Confidence Limit Upper 95% Confidence Limit
2 months prior, number of days with rain 0.16 0.03 27.44 <.0001 1.17 1.10 1.24
1 month prior, mean minimum temperature 0.21 0.08 7.26 0.0071 1.23 1.06 1.43