Skip to main content
. 2018 Aug 30;83(6):1066–1091. doi: 10.1093/imamat/hxy035

Table 5.

Energy budget (in J/s) for the complex model at times A and C

WP-KF KE D E
A (MV Closing) 1.82 -0.38 -0.153 -2.06
(6% of WP-KF-KE) (94% of WP-KF-KE)
C (MV Fully Open) 0.759 0.608 -0.0975 -0.0532
(80% of WP-KF) (13% ofWP-KF) (7.0% of WP-KF)