Skip to main content
. 2018 Dec 30;10(3):e220. doi: 10.5210/ojphi.v10i3.9432

Figure 3.

Figure 3

Figure 3-A: Reported completion times at high volume facilities.

Figure 3-B: Report submission times at high volume facilities.