Skip to main content
. 2019 Jan 4;12(1):144. doi: 10.3390/ma12010144

Figure 6.

Figure 6

AFM three-dimension images of X80 pipeline steel coupons after removing the corrosion products after 30 days. (a) Control; (b) SRB; (c) SRB + 5 mA/cm2 AC; (d) SRB + 10 mA/cm2 AC.