Table 2.
Activities observed in the study.
| Activity observed | Performed by (Gender): |
|
|---|---|---|
| Males | Females | |
| Contracts | ✓ | |
| Review of document | ✓ | ✓ |
| Contacts with occupiers/tenants | ✓ | ✓ |
| Bids and contracts | ✓ | |
| Grading and building permits | ✓ | |
| Site work | ✓ | |
| Foundation | ✓ | |
| Rough carpentry | ✓ | |
| Concrete slabs | ✓ | |
| Heating, ventilation and air conditioning | ✓ | |
| Plumbing work | ✓ | |
| Electrical work | ✓ | |
| Roofing | ✓ | |
| Exterior finishes | ✓ | |
| Insulation | ✓ | |
| Drywalling | ✓ | |
| Floor finishes | ✓ | |
| Painting | ✓ | ✓ |
| Final walk-through | ✓ | |