Reference ID Case studies included in review
Number of cases Type of industry Country Interventiona Measureb Additional information (number of cases)
Azman 2012 1 mining (1) USA retro‐fit noise level, noise dose description of noise measurement (1), follow‐up (1)
Caillet 2012 1 offshore helicopter (1) France all retro‐fit noise level description of noise measurement (1), funding (1), conflict of interest (1)
Cockrell 2015 2 manufacturing (2) USA all retro‐fit noise level, dose description of noise measurement (2)
Golmohammadi 2014 3 steel industry (3) Iran all retro‐fit noise level, dose description of noise measurement (3), funding (3), conflict of interest (3)
HSE 2013a 57 manufacturing (57) not reported new 6
retro‐fit 51
noise level
HSE 2015 2 manufacturing (2) not reported all retro‐fit noise level
Küpper 2013 1 alpine rescue operation (helicopter) (1) Austria, Switzerland new noise level description of noise measurement, follow‐up, statistical tests used
Maling 2016 8 textile (1), paper shredding (1), manufacturing (6) USA new 4,
retro‐fit 2,
both 2
noise level
Morata 2015 18 manufacturing (15), drilling industry (2), mining (1) not reported new 5,
retro‐fit 11,
both 2
noise level, dose description of noise measurement (3)
Pan 2016 3 mining (3) Australia all retro‐fit dose description of noise measurement (2), funding (3), follow‐up (immediate) (3)
Thompson 2015 5 mining(5) USA all retro‐fit noise level, dose description of noise measurement (1), adverse effects: engine over‐heating (1), time of intervention: 2014/2015 (1)
Wilson 2016 6 manufacturing (6) not reported all retro‐fit noise level
Total 107 manufacturing (88), mining (10), steel (3), drilling (2), helicopter (2), textile (1), paper shredding (1) Australia (3), Iran (3), France (1), USA (16), Austria and Switzerland (1), nr (26) retro‐fit (86), new (16), both (4) noise level, dose description of noise measurement (14), funding (7), follow‐up (5), conflict of interest (4), adverse effects (1), time of intervention (1), statistical tests used (1)

aTypes of intervention: installation of completely new equipment (new), intervention to improve existing equipment (e.g. new parts, additional damping material layers) (retro‐fit), or a combination of new and retro‐fit interventions (both).
 bNoise level (including time‐weighted averages or sound pressure levels), dose (including calculations according to OSHA, NIOSH, or MSHA PEL specifications).