Skip to main content
. 2019 Jan 19;19(2):402. doi: 10.3390/s19020402

Figure 9.

Figure 9

Per-node and average battery capacity depletion during SYNCH operations for the optimized and non-optimized schemes for N=20 (a) and N=50 (b).