Skip to main content
. 2018 Jul 23;24(1):51–63. doi: 10.1007/s11367-018-1504-2

Table 3.

Total sea vessel operations for 1 Pelamis. Activities include installing and recovery of moorings and power cabling, sea trials, towing to site, latching, unlatching and inspections

Sea vessel Fuel consumption (l/day) Total days of operation
Installation
 Barge 290 11.8
 Multicat 1710 23.8
 Tug 1490 11.8
Annual maintenance
 Tug 1490 4
 Inspection vessel 500 1.3
Decommissioning
 Barge 290 2.5
 Multicat 1710 8.5
 Tug 1490 2.5