Table 2.

Timetable of activities and measurements for the experiment.

Activity July August September
Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3
Trial setup
Watering with 2.2 l pot−1
Introduction of 3 adult earthworms pot−1
Watering with 5.2 l pot−1 in total
Addition of 1 g pot−1 of hay
Planting of 4 lettuce plants pot−1
Watering regime applied
Cutting of lettuce
Slug introduction & slug control treatment
TDR measurements
Lettuce growth measurements
Slug herbivory assessment
Earthworm activity measurement
Removal of slugs
Removal of earthworms

Wk = week of respective month in the year 2015. Check marks indicate the time of application or action of the respective activity.