Globally averaged electricity system LCOE for the transition period from 2015 to 2050. LCOE primary levelized cost of electricity generation, LCOS levelized cost of storage, LCOC levelized cost of curtailment, LCOT levelized cost of transmission. a Breakdown by system components. b Breakdown by cost components. The energy transition leads to lower cost electricity supply. Applied financial and technical assumptions do not consider any breakthrough in efficiency or cost development, only evolutionary improvements and extending existing trends (see Supplementary Material for assumptions and results for all major regions)