Skip to main content
. 2018 Nov 30;92(1094):20180637. doi: 10.1259/bjr.20180637

Table 3.

Problems with checklist implementation

To what extent are the following a problem to implementing checklists where you work?
No problem Small problem Moderate problem Large problem Very large problem Total Weighted average
Inadequate time to complete it within appointment lots 28 (31%) 32 (35%) 21 (23%) 9 (10%) 1 (1%) 91 2.15
Resources to scan paper checklists onto an information system 32 (35%) 25 (27%) 25 (27%) 8 (9%) 1 (1%) 91 2.13
A feeling it is superfluous to patient care 43 (47%) 31 (34%) 15 (16%) 2 (2%) 0 (0%) 91 1.74
Different levels of commitment by individuals or staff groups 20 (22%) 35 (38%) 27 (30%) 8 (9%) 1 (1%) 91 .29
A feeling the checklist used is too lengthy and not all data are necessary 31 (34%) 21 (23%) 27 (30%) 12 (13%) 0 (0%) 91 2.22
Other problems 69 (76%) 11 (12%) 7 (8%) 4 (4%) 0 (0%) 91 1.41