Summary of the levels of accessibility to the buildings defined in this research.

Code Name Characteristics
A Accessible Access at street level, or through a ramp with maximum slope of 8%, or a step up to 1 cm.
B Accessible with difficulty Access with a ramp of 10% slope or less, or a step up to 5 cm overcome with a ramp of 25% slope or less.
C Practicable with help Access with a ramp with 12% slope or less, or a step up to 12 cm alone or with a ramp of 30% slope or less, or a step up to 3 cm round or beveled.
D Not accessible The rest of the cases.