Skip to main content
. 2019 Feb 13;9(2):28. doi: 10.3390/membranes9020028

Figure 7.

Figure 7

Permeability and boric acid passage of commercial seawater (triangles) and brackish water (squares) reverse osmosis elements, pristine ESPA1 element (diamond), and modified ESPA1 element (circle). Modification conditions: 2 mM GMA with addition of 0.045 mM Triton, modification time 0.5 h.