Skip to main content
. 2018 Mar 21;10(4):344. doi: 10.3390/polym10040344

Table 4.

Conditions of hot-dip galvanized steel sheet adhesive joints preparation for the shear strength testing.

Variant Method of Adhesive Compounds Preparation Curing Period Seasoning Period Seasoning Conditions
Variant A Method I 7 days - Temperature: 23 °C ± 2 °C
Humidity: 23 ± 2%
Variant B Method II -
Variant C Method I 2 months Temperature: 50 °C ± 1 °C
Humidity: 50 ± 1%