Table 4:
Na | mean | SD | median | IQR | |
---|---|---|---|---|---|
Unadjusted Estimated Cost | |||||
25th Percentile Wage | 2586 | 150.70 | 213.46 | 68.44 | (19.05 - 207.57) |
50th Percentile Wage | 2586 | 184.50 | 236.00 | 82.15 | (23.02 - 253.54) |
75th Percentile Wage | 2586 | 217.79 | 307.45 | 98.24 | (28.02 - 300.15) |
Adjustedb Estimated Cost | |||||
25th Percentile Wage | 2544 | 150.86 | 53.42 | 145.03 | (111.33 - 187.52) |
50th Percentile Wage | 2544 | 184.70 | 65.75 | 177.55 | (135.94 - 229.91) |
75th Percentile Wage | 2544 | 217.99 | 77.03 | 209.73 | (160.89 - 270.90) |
Total child-months of observation
Adjusted for family income, child age, child gender, and time since enrollment in the program, via generalized linear model with gamma distribution and log link
IQR - Interquartile Range