Skip to main content
. 2019 Mar 20;15:26. doi: 10.1186/s13007-019-0409-9

Fig. 3.

Fig. 3

Installation of the subsurface irrigation compartments and MR tubes. a Irrigation tube lined with wicking material supported by a steel frame skeleton. Lower driplines placed within the tube. b Irrigation tube fixed by stone fill with upper dripline installed before soil backfilling. c Overview of subsurface irrigation compartments during installation. d Installation of MR tubes after soil backfilling. e Schematic drawing of the subsurface irrigation compartments