Table 5.
Time distribution in harvesting operation of conventional and mid-size combines.
| Mean time | Conventional Combine |
Mid-size Combine |
p value | Difference% | ||
|---|---|---|---|---|---|---|
| Average (h/ha) | % Total time | Average (h/ha) | % Total time | |||
| Effective Time | 0.78 ± 0.08 § | 60.00% | 1.36 ± 0.180 | 71.69% | 0.00258*** | -11.69 |
| Cornering time | 0.11 ± 0.005 | 8.28% | 0.06 ± 0.005 | 3.05% | 0.00361** | +5.23 |
| Reverse time | 0.10 ± 0.031 | 7.20% | 0.11 ± 0.011 | 5.79% | 0.0356* | +1.41 |
| Dumping time | 0.31 ± 0.030 | 23.10% | 0.36 ± 0.052 | 18.95% | 0.0423* | +4.15 |
| Others | 0.04 ± 0.007″ | 2.50% | 0.01 ± 0.041 | 0.52% | 0.1872 ns | +1.98 |
| Total time | 1.33 ± 0.095 | 100.00% | 1.9 ± 0.121 | 100.00% | ----- | 0.00 |
***Significant at α = 0.001, **Significant at α = 0.01, *significant at α = 0.05 and ns = not significant.
§ At 95% confidence interval.
” Others” means operator time and maintenance time.