Table 1.
model variant | excess of large grains ejected | small-grain lining | pit completion time | large-grain excess at bottom of trench during construction | small grains at nadir |
---|---|---|---|---|---|
central digging, no redistribution | ✗ | ✓* | ✗ | ✗ | ✗ |
central digging, no drag | ✓* | ✓* | 800 | ✗ | ✗ |
central digging with drag | ✓* | ✓ | 500 | ✗ | ✓* |
spiral digging r = 25, with drag | ✓ | ✓ | 300 | ✓ | ✓ |
spiral digging r = 50, with drag | ✓ | ✓ | 600 | ✓ | ✓ |