Skip to main content
. Author manuscript; available in PMC: 2019 Apr 11.
Published in final edited form as: J Radioanal Nucl Chem. 2018;318:10.1007/s10967-018-6032-9. doi: 10.1007/s10967-018-6032-9

Table 7.

Uncertainty budget for 229Th half-life determination

Component Comment Type ui%2
Activity ratio Standard uncertainty of combined activity ratio measurements from this study A 0.48
LTAC 229Th activity Standard uncertainty of the M solution massic activity B 0.28
229Th molality Combined standard uncertainty of the measured 229Th molality B 0.07
Dilution factor Standard uncertainty of the dilution factor for production of SRM 4328C from the M solution B 0.03
Decay interval Relative uncertainty associated with the interval between the M solution reference date and molality
measurements
B 0.00
Relative combined standard uncertainty (uc) 0.56%
229Th half-life (a)  Expanded uncertainty3 (a)
7825  87 (Relative: 1.1%)

The uncertainty estimate for the half-life was calculated in accordance with Taylor and Kuyatt, [20] and GUM protocols [21] using the GUM Workbench software [22]. ui% represents the relative standard uncertainty for the listed components. The expanded uncertainty (U = k × uc) for the half-life value is the product of the combined standard uncertainty (uc) and a coverage factor (k), with k = 2 to achieve an approximately 95% level of confidence