Table 3.
Curing conditions of geopolymer coatings, divided in two batches.
Batch | Curing Conditions | Temperature °C | Curing Time (days) | Average RH % |
---|---|---|---|---|
1 | Laboratory bench | 20 ± 2 | 28 | 50 |
2 | Environmental chamber | 20 ± 1 | 28 | 95 |
Curing conditions of geopolymer coatings, divided in two batches.
Batch | Curing Conditions | Temperature °C | Curing Time (days) | Average RH % |
---|---|---|---|---|
1 | Laboratory bench | 20 ± 2 | 28 | 50 |
2 | Environmental chamber | 20 ± 1 | 28 | 95 |