Skip to main content
. 2019 Apr 18;14(4):e0215171. doi: 10.1371/journal.pone.0215171

Table 2. Parameters of electrical drilling, Part 1 (E+no = mean of 5 drilling procedures).

Experiment no. Penetration rate [%] Drilling time [s] Deviation in angles Force–mean [N]** Force–max [N]**
xz yz x y z x y z
1–5 (E1) 60 58 1.7 1.4 2 0 60 7 6 84
6–10 (E2) 100 65 0.8 0.8 6 -5 68 12 9 86
11–15 (E3) 100 50 3.6 1,3 12 -5 98 21 15 132
16–20 (E4) 100 79 1.9 1.7 10 -9 77 19 18 123
max 100 163 5 4 18 5 116 25 22 142
mean 90 63 2 1.3 7 -5 76 15 12 106
min 69 26 0 0 -3 -13 44 3 3 65