Skip to main content
. 2019 Apr 4;19(7):1624. doi: 10.3390/s19071624

Figure 4.

Figure 4

IMU intrinsics estimation in corridor 1 (a) and magistrale 1 (b). Solid lines are the estimation results and the dotted lines with the same color are the corresponding reference value.