Skip to main content
. Author manuscript; available in PMC: 2019 Dec 4.
Published in final edited form as: Irrig Sci. 2018 Dec 3;1:1–23. doi: 10.1007/s00271-018-0613-9

Table 7.

ANOVA results for LE flux for the different flights acquired between 2014 and 2016

Parameter Source of variation SS df MS F (observed) P value F (critical)

August 2014 (LE) Groups 2280.2 1 2280.2 0.38 0 3.84
Error 6,000,867 998 6012.89
Total 6,003,147 999
June 2015 (LE) Groups 14609.2 1 14609.2 0.59 0.4436 3.84
Error 24,472,706 984 24870.6
Total 24,487,316 985
July 2015 (LE) Groups 4889.28 1   4889.3 0.16 0.6854 3.84
Error 29,661,146 996 29780.3
Total 29,666,036 997
May 2016 (LE) Groups 11763.3 1 11763.3 4.07 0.0439 3.84
Error 2889741.5 1000   2889.7
Total 2901504.2 1001