Skip to main content
. Author manuscript; available in PMC: 2019 Apr 26.
Published in final edited form as: Energy Sustain Dev. 2018 Jun 30;46:11–22. doi: 10.1016/j.esd.2018.06.008

Table 5:

Breakdown of biodigester size and capacity (subsidy remains fixed) (NBP, 2011)

Plant size 4 m3 6 m3 8 m3 10 m3 15 m3
Estimated cost (USD) 400 470 550 625 890
Dung requirements 20–40 40–60 60–80 80–100 100–150
[kg/day]
Estimated gas production (m3/day) 0.8–1.6 1.6–2.4 2.4–3.2 3.2–4.0 4.0–6.0
Estimated fuel wood saving (kg/day] 4–8 8–12 12–16 16–20 20–30