Skip to main content
. Author manuscript; available in PMC: 2020 May 15.
Published in final edited form as: Biol Psychiatry. 2018 Dec 4;85(10):863–871. doi: 10.1016/j.biopsych.2018.11.021

Table 2:

Means and Standard Deviations for ERP measures

Reward Positivity Analyses Late Positive Potential Analyses
Win Loss Pleasant Picture Neutral Picture
Mean SD Mean SD Mean SD Mean SD
Raw Components
 Baseline
  PCIT-ED 5.74 9.68 4.84 9.27 48.43 13.69 48.48 14.42
  Waitlist Control 5.62 7.65 4.68 7.44 47.61 14.11 45.13 13.34
 Post Treatment
  PCIT-ED 6.63 8.78 4.52 8.82 47.58 14.49 43.44 13.30
  Waitlist Control 3.30 7.38 1.71 8.32 47.22 11.84 42.75 12.18
Residualized Components
 Baseline
  PCIT-ED −0.03 5.79 0.12 5.52 −1.59 6.04 1.84 6.43
  Waitlist Control −0.03 5.34 0.05 5.21 0.43 5.92 −0.79 5.38
 Post Treatment
  PCIT-ED 0.65 5.83 0.09 5.86 −0.14 6.15 0.18 5.61
  Waitlist Control −0.67 5.01 −0.10 5.64 0.14 5.63 −0.19 5.75