Skip to main content
. 2019 May 7;7:172. doi: 10.3389/fped.2019.00172

Figure 1.

Figure 1

Port placement. We use an 8.5-mm or 12-mm camera and two 8.5-mm working ports. If any bowel work is going to be performed or if a sling is going to be used, we suggest a 12-mm assist in the left upper quadrant. If just an APV is going to be performed, a 5-mm assist port can be used.