Skip to main content
. 2019 May 9;2019:3746964. doi: 10.1155/2019/3746964

Table 2.

EC data to estimate the operational cost of synthetic effluent for 30, 60, 90, and 120 minutes using a current (i) of 3.0 A and supporting electrolyte (ES) of 0.200 mol L−1, and for the mining effluent, for 90 minutes, using 3.0 A of current and 0.400 mol L−1 of supporting electrolyte.

Effluent Time (min) Potential (V) i (A) Vol. (L) ES (g) CE (Wh L−1) ME (g)
Synthetic 30 12.6 3.0 4.0 68.00 4.725 0.503
Synthetic 60 12.5 3.0 4.0 68.00 9.375 1.006
Synthetic 90 11.7 3.0 4.0 68.00 13.162 1.510
Synthetic 120 12.8 3.0 4.0 68.00 19.200 2.013
Mining 90 3.5 3.0 4.0 29.80 3.937 1.510