Skip to main content
. Author manuscript; available in PMC: 2019 May 23.
Published in final edited form as: Ind Eng Chem Res. 2016 Mar 21;55(14):4089–4097. doi: 10.1021/acs.iecr.6b00098

Figure 11.

Figure 11.

Overall permeate concentration during feed and bleed recovery of Plant Bowen scrubber water. Assume ΔP = 13.8 bar and cross-flow is maintained at 11.4 L/min. Feed pH = 4.5.