Skip to main content
. 2019 May 10;12(9):1541. doi: 10.3390/ma12091541

Figure 4.

Figure 4

Swelling capacity in cement filtrate and mortar compressive strength (n = 6) after 3, 7 and 28 days for SAPs with different amounts of cross-linker, compared to the reference.