Skip to main content
. 2019 May 28;10:1019. doi: 10.3389/fpsyg.2019.01019

Table 2.

Means and standard errors of the variables under study.

Perceived PM Strategic choice
TBP percentage M SD M SD
TBP0% −1.38 1.17 1.80 0.41
TBP16.7% −0.75 1.08 1.80 0.41
TBP34.4% −0.38 1.08 1.55 0.50
TBP50% 0.30 0.65 1.65 0.48
TBP66.7% 0.69 0.69 1.25 0.44
TBP83.4% 0.95 0.85 1.30 0.46
TBP100% 1.83 0.84 1.18 0.39