Skip to main content
. 2019 Jun 4;14(6):e0217852. doi: 10.1371/journal.pone.0217852

Fig 7. Computation time required to split the dataset generated using the Barabasi–Albert model.

Fig 7

x-axis and y-axis correspond to the number of nodes and the average of running time [ms].