Table 1.
The reliability of maximal velocity (Vmax), the load corresponding to given decrements in velocity (Lopt), and the slope of the load–velocity relationship during resisted sled pulling. Results are shown as mean ± SD and reliability statistics (95% CI). CV—coefficient of variation; ICC—intra-class correlation; Vmax—maximum velocity; Lopt—optimal load.
| Reliability of Sprint Variables | Mean | Change in Mean (%) | CV (%) | ICC | ||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Trial 1 | Trial 2 | Trial 3 | Trial 1–2 | Trial 2–3 | Trial 1–2 | Trial 2–3 | Trial 1–2 | Trial 2–3 | ||
| Vmax (m/s) | Un-resisted | 7.9 ± 0.5 | 8.0 ± 0.4 | 7.9 ± 0.5 | 1.0 | −1.5 | 2.8 | 2.1 | 0.84 | 0.88 | 
| (−1.1–3.1) | (−3.1–0.0) | (2.1–4.4) | (1.6–3.3) | (0.64–0.95) | (0.68–0.96) | |||||
| 27 kg | 6.1 ± 0.8 | 6.1 ± 0.8 | 6.1 ± 0.7 | −0.6 | −0.7 | 4.9 | 3.1 | 0.84 | 0.92 | |
| (−4.1–3.0) | (−1.7–3.2) | (3.6–7.6) | (2.3–5.0) | (0.60–0.94) | (0.79–0.97) | |||||
| +20% BM | 5.2 ± 0.5 | 5.2 ± 0.5 | 5.1 ± 0.6 | −1.1 | −1.0 | 3.4 | 4.2 | 0.91 | 0.87 | |
| (−3.5–1.4) | (−4.1–2.3) | (2.5–5.2) | (3.1–6.7) | (0.75–0.97) | (0.66–0.95) | |||||
| +40% BM | 4.4 ± 0.6 | 4.1 ± 0.4 | 4.4± 0.6 | −5.7 | 6.2 | 7.1 | 6.7 | 0.72 | 0.77 | |
| (−10.5–−0.7) | (1.2–11.5) | (5.2–11.3) | (4.9–10.5) | (0.36–0.89) | (0.45–0.91) | |||||
| +60% BM | 3.7 ± 0.6 | 3.5 ± 0.5 | 3.8 ± 0.6 | −7.1 | 8.0 | 8.6 | 9.0 | 0.69 | 0.73 | |
| (−13.4–−0.4) | (0.7–15.8) | (6.1–14.6) | (6.4–14.8) | (0.24–0.90) | (0.34–0.90) | |||||
| Lopt (% BM) | 10% Vdec | 17 ± 1 | 17 ± 1 | 17 ± 1 | −1.5 | 0.1 | 3.2 | 3.3 | 0.71 | 0.65 | 
| (−4.3–1.4) | (−2.8–3.0) | (2.3–5.6) | (2.3–5.6) | (0.26–0.91) | (0.15–0.88) | |||||
| 25% Vdec | 42 ± 4 | 43 ± 3 | 42 ± 2 | 1.2 | −0.7 | 4.8 | 3.7 | 0.60 | 0.60 | |
| (−3.0–5.6) | (−3.9–2.6) | (3.4–8.3) | (2.6–6.4) | (0.07–0.87) | (0.08–0.87) | |||||
| 50% Vdec | 84 ± 7 | 85 ± 5 | 85 ± 4 | 1.3 | −0.6 | 4.6 | 3.5 | 0.63 | 0.64 | |
| (−2.7–5.5) | (−3.7–2.5) | (3.3–8.0) | (2.5–6.1) | (0.12–0.88) | (0.13–0.88) | |||||
| 75% Vdec | 125 ± 11 | 128 ± 8 | 127 ± 5 | 1.4 | −0.9 | 4.8 | 3.7 | 0.60 | 0.60 | |
| (−2.8–5.8) | (−4.1–2.4) | (3.4–8.3) | (2.6–6.4) | (0.07–0.87) | (0.07–0.87) | |||||
| Slope Load–Velocity | −1.72 ± 0.15 | −1.72 ± 0.08 | −1.72 ± 0.06 | −0.7 | 0.4 | 4.0 | 2.2 | 0.71 | 0.75 | |
| (−4.1–2.9) | (−1.5–2.4) | (2.8–6.8) | (1.6–3.8) | (0.23–0.91) | (0.30–0.92) | |||||