Skip to main content
. 2019 Jun 18;11:144. doi: 10.3389/fnagi.2019.00144

Table 3.

Results of the generalized linear mixed model using montage to examine the SSST and GPT performance, before, during and after tDCS.

SSTCost Before SSTCost During SSTCost After
Estimate p 95% Conf Int Estimate p 95% Conf Int Estimate p 95% Conf Int
BAL 0.018182 0.477 −0.032392 0.068756 −0.126841 0.001 −0.184939 −0.068743 −0.026259 0.362 −0.083200 0.030682
BAR 0.004509 0.860 −0.046065 0.055083 −0.027555 0.348 −0.085653 0.030544 −0.005023 0.861 −0.061964 0.051919
UAL 0.018395 0.471 −0.032179 0.068970 −0.020832 0.478 −0.078930 0.037267 0.006086 0.832 −0.050855 0.063028
UAR 0.01255 0.623 −0.038024 0.063124 −0.025382 0.387 −0.083480 0.032717 0.024264 0.399 −0.032678 0.081205
GPTCost Before GPTCost During GPTCost After
Estimate p 95% Conf Int Estimate p 95% Conf Int Estimate p 95% Conf Int
BAL 0.011586 0.594 −0.031504 0.054677 −0.056991 0.020 −0.104686 −0.009296 −0.011705 0.618 −0.058150 0.034741
BAR 0.027536 0.207 −0.015554 0.070627 −0.024768 0.305 −0.072463 0.022927 0.008491 0.717 −0.037954 0.054936
UAL 0.011936 0.583 −0.031154 0.055027 0.000109 0.996 −0.047586 0.047804 0.057595 0.016 0.011150 0.104041
UAR 0.0097 0.656 −0.033390 0.052790 −0.005432 0.821 −0.053127 0.042263 0.029573 0.209 −0.016873 0.076018

Estimates refer to differences from Sham.