Table 3.
Method | Estimate | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Roadway
Geometry |
A | B | C | D | E | F | G | H | I | X |
Overall | Straight | Curve | L200 | L500 | L800 | R200 | R500 | R800 | Combined | |
Resubstitution | 0.491 | 0.527 | 0.400 | 0.455 | 0.473 | 0.482 | 0.345 | 0.400 | 0.509 | 0.309 |
Cross-Validation | 0.736 | 0.645 | 0.700 | 0.609 | 0.691 | 0.755 | 0.682 | 0.682 | 0.709 | 0.764 |