Skip to main content
. 2019 Jun 25;60(4):326–330. doi: 10.4111/icu.2019.60.4.326

Fig. 1. Placement of the GelPOINT advanced access platform. A 25-mm multichannel port and a 12-mm assistant port were placed through the GelSeal cap.

Fig. 1