Skip to main content
. Author manuscript; available in PMC: 2019 Jul 17.
Published in final edited form as: Int J Tuberc Lung Dis. 2018 Dec 1;22(12):1435–1442. doi: 10.5588/ijtld.18.0370

Table 2.

Unit costs and cost decomposition in 2016 US$

Description Base US$ Low US$ High US$ Source*
Cost of TST 3.90 3.32 7.27 Study; (30)
 Nursing staff time (application and reading) 1.55
 Consumables and materials (gloves, syringes, needles, box for syringes) 1.51
 Training unit cost 0.77
 Overhead unit cost 0.07
Cost of QGIT 57.88 27.13 101.43 Study
 Nursing staff time 1.44
 Consumables and materials 12.15
 Laboratory cost 38.99
 Sample transport cost 5.26
 Overhead unit cost 0.04
Costs of IPT
 Isoniazid 300 mg/day (monthly) 0.90 Study
 Initial consultation 0.98 0.49 2.65 Study
 Follow-up out-patient consultation 0.77 0.28 1.66 Study
Total cost of IPT treatment (12 months) 20.25 11.97 34.11 Calculated; (31)
Costs related to DILI and TB treatment costs
 Basic laboratory test (blood count) 4.18 1.05 7.32 (32,33)
 Liver function test 9.47 2.37 16.57 (32,33)
 Sputum test 2.13 1.08 2.33 (32,33)
 Chest X-ray 20.08 9.92 24.91 (32,33)
 Out-patient follow-up at tertiary hospital 13.32 9.80 38.93 (31)
 Hospitalization per diem 116.15 47.80 126.64 Study; (31)
 Active TB treatment 158.74 120.61 304.06 (30,32)
*

Estimates were derived from data collected at study clinics and local hospitals.

TST = tuberculin skin test; QGIT = QuantiFERON®-TB Gold In-Tube; IPT = isoniazid preventive therapy; DILI = drug-induced liver injury; TB = tuberculosis.