Skip to main content
. 2019 Jan 17;36(4):852–860. doi: 10.1093/molbev/msz008

Fig. 1.

Fig. 1.

Base 10 logarithm of the ratio of runtimes for LFMM 1.5 and LFMM 2.0. A value of 5 means that LFMM 2.0 runs 105 times faster than LFMM 1.5. (A) n = 100 individuals, (B) n = 400, (C) n = 1,000, p is the total number of markers in the simulation.