Skip to main content
. 2019 Jul 26;13:45. doi: 10.3389/fnbot.2019.00045

Table 5.

Second late-object test: success of the three systems IGN, FIX, and IMP in the five extrinsic scenarios.

Extrinsic-phase scenario
System 1 2 3 4 5
IGN 1.0 1.0 1.0 0.0 0.0
FIX 0.9 0.9 0.7 0.0 0.0
IMP 1.0 0.9 0.9 0.0 0.0

Data as in Table 2.