Skip to main content
. Author manuscript; available in PMC: 2019 Aug 8.
Published in final edited form as: Water (Basel). 2018 Jul 27;10(8):991. doi: 10.3390/w10080991

Figure 5.

Figure 5

Percent change for watershed water balance components for three different types of LID practices at the outlet of the watershed (RG: Rain Garden, PP: Permeable Pavement, and RB: Riparian Buffer), (a) peak flow; (b) surface runoff; (c) ET (evapotranspiration); and (d) shallow subsurface runoff and infiltration. At the maximum level of implementation (100% and 40 m) RG, PP, and RB cover 6.4%, 2.1%, and 3% of the total watershed area, respectively.