Skip to main content
. 2019 Aug 6;5(5):e70. doi: 10.1192/bjo.2019.22

Table 2.

Levels of completion and correctness of completion of mental health indicators in routine heath information systems across five LMICs

Diagnosis
N (%)
Exact diagnosis
N (%)
Severity
N (%)
Functioning
N (%)
Treatment administered
N (%)
Referral
N (%)
Follow-up
N (%)
Payment
N (%)
India Completion T1 N = 61 61 (100) 49 (80.0) 61 (100) n/a 60 (98.0) 2 (100)a 41 (100)a n/a
T2 N = 74 65 (87.8) 63 (85.1) 29 (39.1) n/a 65 (87.8) 4 (100)a 3 (100)a n/a
Correctnessb T1 60 (98.0) 46 (94.0) 60 (98.0) n/a 42 (70.0) 2 (100)a 29 (100)a n/a
T2 64 (98.4) 55 (87.3) 29 (100) n/a 64 (98.4) 4 (100)a 3 (100)a n/a
Nepal Completion T1 N = 95 82 (86.3) 27 (28.4) 81 (85.3) 45 (47.4) 76 (80.0) 16 (16.8) 55 (57.9) 35 (36.8)
T2 N = 58 57 (98.3) 43 (74.1) 56 (96.6) 38 (65.5) 55 (94.8) 32 (55.2) 51 (87.9) 37 (63.8)
Correctnessb T1 79 (96.3) 24 (88.9) 81 (100) 28 (62.2) 71 (93.4) 15 (93.7) 52 (94.5) 29 (82.8)
T2 57 (100) 43 (100) 56 (100) 38 (100) 55 (100) 32 (100) 51 (100) 37 (100)
Nigeria Completion T1 N = 45 36 (80) n/a 34 (75.6) 34 (75.6) 45 (100) 45 (100) 27 (60) 39 (86.7)
T2 N = 43 43 (100) n/a 42 (97.7) 37 (86.0) 42 (97.7) 42 (97.7) 43 (100) 43 (100)
Correctnessb T1 25 (69.4) n/a 32 (94.1) 32 (94.1) 44 (97.8) 42 (93.3) 22 (81.5) 39 (100)
T2 43 (100) n/a 41 (97.6) 36 (97.3) 41 (97.6) 39 (92.9) 43 (100) 43 (100)
South Africa Completion T1 N = 32 28 (87.5) 31 (96.9) 30 (93.8) n/a 20 (62.5) 31 (96.9) 32 (100) n/a
T2 N = 40 40 (100) 40 (100) 40 (100) n/a 40 (100) 40 (100) 40 (100) n/a
Correctnessb T1 28 (100) 31 (100) 30 (100) n/a 20 (100) 31 (100) 31 (96.9) n/a
T2 40 (100) 40 (100) 40 (100) n/a 40 (100) 40 (100) 40 (100) n/a
Uganda Completion T1 N = 66 65 (98.5) 43 (65.2) n/a 64 (97.0) 62 (95.4) 22 (33.9) 59 (89.4) 42 (63.6)
T2 N = 69 69 (100) 62 (89.9) n/a 68 (98.6) 69 (100) 27 (39.1) 63 (91.3) 22 (31.9)
Correctnessb T1 62 (95.4) 23 (53.5) n/a 58 (95.1) 32 (50.0) 7 (35.0) 18 (31.0) 0
T2 61 (88.4) 37 (59.7) n/a 45 (66.2) 52 (75.4) 9 (33.3) 45 (71.4) 8 (36.4)
a.

The response options and the denominators for these items were different from the other countries; these are therefore not included in the summaries of results.

b.

Correctness refers to level of completed indicators that was correctly completed (as opposed to ‘incorrect completion’).