Table 4:
Monte Carlo simulation results of costs associated with change in utilization
| Mean (2018 dollars) |
Standard Deviation |
Min | Max | |
|---|---|---|---|---|
| Total Cost Savings - PMPM | −69.42 | 51.17 | −318.74 | 46.58 |
| Total Cost Savings - annual | −833.01 | 614.04 | −3824.82 | 558.98 |
| Cost of SBIRT | 51.05 | 9.82 | 27.87 | 75.26 |
| Total Net Cost Savings | −781.97 | 608.75 | −3751.85 | 626.66 |
Note: Simulation is based on 10,000 trials with mean and standard deviations as noted. Ninety-five percent of trials resulted in positive net cost offset.